top of page

BARN 60
Modular house
Residential house
Helsinki 30 TOP
About the project
BARN 60 projekts ir ar plašu dzīvojamo telpu apvienotu ar virtuvi, divām pilnvērtīgām un plašām guļamistabām. Barn tipa logi ēkas priekšpusē padara šo modeli īpašu un saules gaismas piepildītu. Iespējams izbūvēt loftu (2. pusstāvu) mantu uzglabāšanai vai kā guļamistabu.
HOUSE DIMENSIONS:
Building area: 6x10m
Living area: 53m2
Bedroom
Living room
Kitchen area
Bathroom
HOUSE PRICE:
Factory kit: 26,499 eur (incl. VAT)
Basic package: 33,250 eur (including VAT)
Standard package: 41,250 eur (including VAT)
Turnkey: 49,125 EUR (including VAT)
Available plans
Ar vienu guļamistabu
The first floor of the house has a living room with a kitchen area, a bedroom and a full bathroom with space for a shower cabin, sink and toilet.
HOUSE DIMENSIONS:
Building area: 6x10m
Living area: 53m2
Price calculation
House construction time up to 3 months + possible queue. Before ordering a house, we provide a free consultation, inspect the desired location, adjust the layout and type of foundation.
BASIC EQUIPMENT
Finished from the outside
33,250 euros (including VAT)
Komplektācijā iekļauts:
koka karkass c24
vates siltinājums 150mm sienas,
200mm grīda, 250mm griesti
trīs stikla pakešu logi un logi, U~ 0.6
profilēts metāla jumts
koka dēļu fasāde (krāsā pēc izvēlēs) vai metāla sienu apdare
difūzijas, tvaika membrānas
OSB grīdassegums
STANDARD
With interior decoration
41,250 euros (including VAT)
The package includes:
wooden frame c24
wool insulation 150mm walls,
200mm floor, 250mm ceiling
triple glazed windows and windows, U~ 0.6
profiled metal roof
wooden plank facade (color of your choice)
or metal wall decoration
diffusion, vapor membranes
vinyl laminate flooring
indoor communications (water pipes, sewage, electricity)
recovery
wooden interior decoration in color of your choice
lighting
UNTIL THE KEY
With kitchen, bathroom and heating
82 875 eur (ar PVN)
Komplektācijā iekļauts:
koka karkass c24
vates siltinājums 150mm sienas,
200mm grīda, 250mm griesti
trīs stikla pakešu logi un logi, U~ 0.6
profilēts metāla jumts
koka dēļu fasāde (krāsā pēc izvēlēs) vai metāla sienu apdare
difūzijas, tvaika membrānas
vinila lamināta grīdas segums
iekštelpu komunikācijas (ūdensvadi, kanalizācija, elektrība)
rekuperācija
koka iekštelpu apdare krāsā pēc izvēles
apgaismojums
vannas istabas aprīkojums (iebūvētais tualetes pods, duša, izlietne, radiators, boileris)
virtuves iekārta ar tehniku (elektriskā plīts virsma, ledusskapis, tvaiku nosūcējs, izlietne ar krānu)
gaiss - gaiss siltumsūknis
Papildus pakalpojumi
provision of furniture/home appliances
planning changes
foundation construction
air - air heat pump
air - water heat pump with underfloor heating
price by agreement
free of charge
1,680 EUR
1,450 EUR
5,980 EUR
electric heated floors
delivery and installation
terrace 20m2
canopy
change of materials or thermal insulation
other, individual services
from 850 EUR
from 1,500 EUR
3,000 EUR (150 EUR/m2)
price by agreement
price by agreement
price by agreement
UNO 35 tūre
Procurement, design and construction process
UNO 35 cena
DESIGN PHASE
CONSTRUCTION PHASE
MĀJAS APDARE
UN TĪKLI
20% maksājums
Tiek izbūvētas iekšējie komunikāciju tīkli, iekštelpu un fasādes apdare
HOUSE FRAMEWORK CONSTRUCTION
30% payment for finishing.
A house is being built, waterproofed and insulated
STARTING CONSTRUCTION
40% advance payment before construction begins for the procurement of materials
PROJEKTA IZVĒLE
Ēkas tipa izvēle atbilstoši funkcijai
CONCLUSION OF THE CONTRACT
We agree on the details of the order, the project is adjusted, and a contract is signed.
Advance payment of 5%
ROW
Sometimes we can start building construction immediately, sometimes we have to wait in line for up to 2 months.
WINDOW DELIVERY
Windows are manufactured and delivered within 4 weeks of placing the order.
SITE SURVEY
The object is surveyed - the approach, the desired location of the house. We agree on the ideal option.
CONSTRUCTION SITE
PREPARATION
The construction and preparation of the foundation and utilities (water, sewage, electricity) is underway. Access has been facilitated.
Engineering communications can be constructed and connected even after the building is delivered.
DELIVERY**
The building is delivered and placed on the foundation.
PROJECT COORDINATION
If necessary, a simplified procedure for project coordination with the municipality is established. Review within 10 days, coordination takes up to 2 months.
Day 1
Day 3 - 5
Day 1 - 3
Day 20 - 40
Day 1 - 3
n days
Day 4 - 45
Day 18 - 28
Day 40 - 45
5. - 10. diena
Day 4 - 18
* Preliminary purchase process and lead time, depending on the type of house, planned location, and occupancy.
** If the house cannot be delivered as a whole, we can build it on site or deliver the house in parts
Līdzīgi realizētie projekti



















bottom of page