top of page
BARN-60.jpg

BARN 60

Modular house

Residential house

Helsinki 30 TOP

About the project

BARN 60 projekts ir ar plašu dzīvojamo telpu apvienotu ar virtuvi, divām pilnvērtīgām un plašām guļamistabām. Barn tipa logi ēkas priekšpusē padara šo modeli īpašu un saules gaismas piepildītu. Iespējams izbūvēt loftu (2. pusstāvu) mantu uzglabāšanai vai kā guļamistabu. 

HOUSE DIMENSIONS:


Building area: 6x10m
Living area: 53m2

Bedroom

Living room

Kitchen area

Bathroom

HOUSE PRICE:

Factory kit: 26,499 eur (incl. VAT)
Basic package: 33,250 eur (including VAT)
Standard package: 41,250 eur (including VAT)
Turnkey: 49,125 EUR (including VAT)

Available plans

Ar vienu guļamistabu

The first floor of the house has a living room with a kitchen area, a bedroom and a full bathroom with space for a shower cabin, sink and toilet.

HOUSE DIMENSIONS:

Building area: 6x10m
Living area: 53m2

Price calculation

House construction time up to 3 months + possible queue. Before ordering a house, we provide a free consultation, inspect the desired location, adjust the layout and type of foundation.

BASIC EQUIPMENT

Finished from the outside

33,250 euros (including VAT)

Komplektācijā iekļauts:

koka karkass c24

​vates siltinājums 150mm sienas,
200mm grīda, 250mm griesti
 
trīs stikla pakešu logi un logi, U~ 0.6

profilēts metāla jumts

koka dēļu fasāde (krāsā pēc izvēlēs) vai metāla sienu apdare

difūzijas, tvaika membrānas

OSB grīdassegums

STANDARD

With interior decoration

41,250 euros (including VAT)

The package includes:

wooden frame c24

wool insulation 150mm walls,

200mm floor, 250mm ceiling

 

triple glazed windows and windows, U~ 0.6


profiled metal roof


wooden plank facade (color of your choice)
or metal wall decoration


diffusion, vapor membranes


vinyl laminate flooring


indoor communications (water pipes, sewage, electricity)


recovery


wooden interior decoration in color of your choice


lighting

UNTIL THE KEY

With kitchen, bathroom and heating

82 875 eur  (ar PVN)

Komplektācijā iekļauts:

koka karkass c24

vates siltinājums 150mm sienas,
200mm grīda, 250mm griesti
 
trīs stikla pakešu logi un logi, U~ 0.6

profilēts metāla jumts

koka dēļu fasāde (krāsā pēc izvēlēs) vai metāla sienu apdare

difūzijas, tvaika membrānas

vinila lamināta grīdas segums

iekštelpu komunikācijas (ūdensvadi, kanalizācija, elektrība)

rekuperācija

koka iekštelpu apdare krāsā pēc izvēles

apgaismojums

vannas istabas aprīkojums (iebūvētais tualetes pods, duša, izlietne, radiators, boileris)
​​
virtuves iekārta ar tehniku (elektriskā plīts virsma, ledusskapis, tvaiku nosūcējs, izlietne ar krānu)

gaiss - gaiss siltumsūknis

 

Papildus pakalpojumi

provision of furniture/home appliances

planning changes

foundation construction

air - air heat pump

air - water heat pump with underfloor heating


 

price by agreement

free of charge

1,680 EUR

1,450 EUR

5,980 EUR



 

electric heated floors

delivery and installation

terrace 20m2

canopy

change of materials or thermal insulation

other, individual services

from 850 EUR

from 1,500 EUR

3,000 EUR (150 EUR/m2)

price by agreement

price by agreement

price by agreement

UNO 35 tūre

Procurement, design and construction process

UNO 35 cena

DESIGN PHASE

CONSTRUCTION PHASE

MĀJAS APDARE
UN TĪKLI 


20% maksājums
Tiek izbūvētas iekšējie komunikāciju tīkli, iekštelpu un fasādes apdare

HOUSE FRAMEWORK CONSTRUCTION

30% payment for finishing.
A house is being built, waterproofed and insulated

STARTING CONSTRUCTION

40% advance payment before construction begins for the procurement of materials

PROJEKTA IZVĒLE

Ēkas tipa izvēle atbilstoši funkcijai 

CONCLUSION OF THE CONTRACT

We agree on the details of the order, the project is adjusted, and a contract is signed.
Advance payment of 5%

ROW


Sometimes we can start building construction immediately, sometimes we have to wait in line for up to 2 months.

WINDOW DELIVERY


Windows are manufactured and delivered within 4 weeks of placing the order.

SITE SURVEY

The object is surveyed - the approach, the desired location of the house. We agree on the ideal option.

CONSTRUCTION SITE
PREPARATION


The construction and preparation of the foundation and utilities (water, sewage, electricity) is underway. Access has been facilitated.
Engineering communications can be constructed and connected even after the building is delivered.

DELIVERY**


The building is delivered and placed on the foundation.

PROJECT COORDINATION

If necessary, a simplified procedure for project coordination with the municipality is established. Review within 10 days, coordination takes up to 2 months.

Day 1

Day 3 - 5

Day 1 - 3

Day 20 - 40

Day 1 - 3

n days

Day 4 - 45

Day 18 - 28

Day 40 - 45

5. - 10. diena

Day 4 - 18

* Preliminary purchase process and lead time, depending on the type of house, planned location, and occupancy.

** If the house cannot be delivered as a whole, we can build it on site or deliver the house in parts

Līdzīgi realizētie projekti

bottom of page